New method for drying the paper insulation of power transformers during service

verfasst von
V. Wasserberg, H. Borsi, Ernst Gockenbach
Abstract

In this contribution a new method for drying the paper insulation of power transformers during service is introduced. The drying system is cost efficient, easy to adapt on every liquid/paper insulated high voltage apparatus, does not affect either the dissolved nor the headspace gas analysis and does not require the apparatus to be taken out of service. The contribution reports about the principle of operation, some measurements on a transformer model and some reflections about a practical realization of the system.

Organisationseinheit(en)
Fachgebiet Hochspannungstechnik und Asset Management (Schering-Institut)
Typ
Konferenzaufsatz in Fachzeitschrift
Journal
Conference Record of IEEE International Symposium on Electrical Insulation
Seiten
251-254
Anzahl der Seiten
4
ISSN
0164-2006
Publikationsdatum
2000
Publikationsstatus
Veröffentlicht
Peer-reviewed
Ja
ASJC Scopus Sachgebiete
Elektrotechnik und Elektronik, Bauwesen